Space is Shaping Up

The Space (aka The Makery) is really starting to come together. A build day has been scheduled for this Saturday (March 26th, 9:37am) to see about some shelves and tables.  Full details on that are the mailing list.

In other news, our local network is operational;  We have Wireless-G, network printing and a functional DHCP/DNS server.  Internet access, long a subject of (heart|head)ache at the space, is scheduled for install tomorrow evening.

Now, a few photos of setting up networking and the general state of things.

Leave a Comment

Your email address will not be published. Required fields are marked *